Log Home Construction - Roof Sheathing


The roof is made up of a "sandwich" of materials in the following order from bottom to top: 1 x 6 knotty pine tongue and groove, 15 lb. felt, wiring, 2 inch thick rigid foam insulation (2 layers), furring strips, OSB board, 30 lb. felt, and shingles. This page shows photos for the 1 x 6 tongue and groove and felt only, since these materials had to be added to the entire roof to keep rain out. The rest of the "sandwich" will be added in sections from wiring completely through shingles on the Roof Covering page.

Installing Roof Sheathing (1 x 6 tongue & groove) and Felt - September 11 - 18, 2003

Day 7 - September 11, 2003

roof_9-11-03_day7_front1.jpg (69021 bytes) roof_9-11-03_day7_front2.jpg (72007 bytes) roof_9-11-03_day7_inside_bedroom1.jpg (85505 bytes) roof_9-11-03_day7_inside_bedroom2.jpg (80395 bytes) roof_9-11-03_day7_inside_bedroom4.jpg (80268 bytes) roof_9-11-03_day7_inside_bedroom_gable.jpg (67590 bytes)  roof_9-11-03_day7_inside_bedroom5.jpg (49467 bytes)

Day 8 - September 12, 2003

roof_9-12-03_day8_front1.jpg (66921 bytes) roof_9-12-03_day8_front2.jpg (66699 bytes) roof_9-12-03_day8_inside_front_gable1.jpg (72998 bytes) roof_9-12-03_day8_inside_front_gable2.jpg (52089 bytes) roof_9-12-03_day8_inside_front_gable3.jpg (44676 bytes) roof_9-12-03_day8_damaged_material_replacement1.jpg (100435 bytes) roof_9-12-03_day8_damaged_material_replacement4.jpg (83556 bytes)

Day 9 - September 16, 2003

roof_9-16-03_day9_inside_kitchen1.jpg (67311 bytes) roof_9-16-03_day9_inside_kitchen2.jpg (78803 bytes) roof_9-16-03_day9_enclosing_shed_dormer.jpg (78504 bytes) roof_9-16-03_day9_inside_kitchen_closeup1.jpg (35876 bytes) roof_9-16-03_day9_inside_kitchen_closeup2.jpg (35261 bytes)

Day 10 - September 17, 2003

roof_9-17-03_day10_front1.jpg (67576 bytes) roof_9-17-03_day10_front2.jpg (66941 bytes) roof_9-17-03_day10_knoll_end.jpg (73121 bytes) roof_9-17-03_day10_garage.jpg (77381 bytes) roof_9-17-03_day10_inside_shed_dormer2.jpg (66545 bytes) roof_9-17-03_day10_inside_shed_dormer1.jpg (45730 bytes) roof_9-17-03_day10_inside_living_room.jpg (86100 bytes)

Day 11 - September 18, 2003

roof_9-18-03_day11_front_yard.jpg (77054 bytes) roof_9-18-03_day11_front1.jpg (73249 bytes) roof_9-18-03_day11_front2.jpg (73326 bytes) roof_9-18-03_day11_knoll_end1.jpg (68259 bytes) roof_9-18-03_day11_knoll_end2.jpg (72972 bytes) roof_9-18-03_day11_garage1.jpg (73949 bytes) roof_9-18-03_day11_garage2.jpg (84256 bytes) roof_9-18-03_day11_inside_front_gable.jpg (57412 bytes) roof_9-18-03_day11_inside_living_room.jpg (59152 bytes)


 